A roof replacement means stripping the old roof down to the wood deck, repairing what the tear-off uncovers and installing a complete new roof system. RISE Roofing replaces roofs on homes across Corpus Christi and the Coastal Bend, and every job starts with a free inspection and a written, price-locked quote. Below you will find the signs that it is time, our installed prices per square foot, what every quote includes, each step of the job and how insurance and financing fit in.

Asphalt shingle roof replacement on a home in Corpus Christi

Signs Your Home Needs a Roof Replacement

Start with the roof's age. Every material wears out on its own schedule, and the lifespans in the price table below show how long yours should last. A roof near the end of its range deserves a close look even if it has never leaked.

Then look for damage that has spread past one spot:

  • Shingles curling, cracking or missing on more than one slope.
  • Bare patches where the granules have worn off, or dark grit piling up below the downspouts.
  • Ceiling stains, damp insulation or darkened wood on the underside of the deck.
  • A roofline that dips or sags between the rafters.
  • Rusted panels, backed-out screws or open seams on a metal roof.
  • Leaks that come back after every repair.

A single problem on a younger roof is usually a repair. Several of these on an older roof usually mean it is time to replace it. Our article on the signs you need a new roof walks through each one in more detail, and a free inspection will tell you which side of the line your roof is on.

Roof Replacement Materials and Installed Prices

These are our installed prices per square foot of roof, not per square foot of floor space. The pitch and the overhangs add surface, so most houses have more roof area than living area.

MaterialInstalled price per sq ftTypical lifespan
3-tab shingles$3.50–$5.5012–18 years
Architectural shingles (Owens Corning Duration)$4.50–$7.0025–30 years
Impact-resistant Class 4 shingles (Duration FLEX, Duration STORM)Priced on your quote30+ years
Standing seam metal$12–$1650–70 years
DECRA stone-coated steel$12–$1650+ years

Shingle roofs

We are an Owens Corning Preferred Contractor and install all three Duration lines: TruDefinition Duration, Duration FLEX and Duration STORM. FLEX and STORM are impact-resistant (Class 4), and some insurers give a premium discount for Class 4 shingles, so ask your agent before you choose. Every shingle gets six nails. The details are on our asphalt shingle roofing page.

Metal roofs

Standing seam hides its fasteners under raised seams, which keeps them out of the salt air. We can roll-form the panels on site, and we install two systems: snap-lock in 24 or 26 gauge, your choice, and a mechanically seamed 1.5-inch, 24-gauge double-lock panel, which is also what we use on slopes below 3:12. Mechanical seam costs more than snap-lock; ask and we will price both. For homes right on the water we also offer aluminum, installed as standing seam only. Our standing seam roofing page has more detail.

Stone-coated steel and tile

RISE is a certified DECRA and Tilcor installer, and we install every profile both brands make. A DECRA roof by RISE was a 2025 DECRA Project of the Year finalist, and DECRA Villa Tile is our top-selling profile. We bring DECRA and Tilcor samples to your home at the consultation. Concrete and clay tile are also options where the framing can carry the extra weight.

What a 2,000 Square Foot Roof Costs

Here is how the per-square-foot prices work out on a roof that measures 2,000 square feet:

  • 3-tab shingles: $7,000 to $11,000
  • Architectural shingles: $9,000 to $14,000
  • Standing seam metal: $24,000 to $32,000
  • DECRA stone-coated steel: $24,000 to $32,000

Where your roof lands inside its range comes down to the pitch, the number of hips, valleys and dormers, how many old layers come off, how easy the roof is to reach and any upgrades you choose. A steep roof with lots of angles takes longer to strip and cover than a simple gable over a one-story ranch house.

Metal and stone-coated steel cost roughly two to three times as much as architectural shingles at the start, and their expected lifespans run about twice as long or more. If you plan to stay in the house for a long time, the longer life counts for more. If you expect to sell within a few years, the lower first cost of shingles usually wins.

What Every Roof Replacement Quote Includes

Each written quote we send covers the whole job, not just the shingles or panels. The price includes:

  • Tear-off of the old roof and disposal of all the debris
  • New underlayment across the entire deck
  • New drip edge along the roof edges
  • New flashing where the roof meets walls, chimneys and pipes
  • Ridge ventilation
  • Full cleanup, finished with a magnet sweep for stray nails

Rotten decking is the one item outside the signed price, because nobody can see every bad board until the old roof is off. Your quote lists a price per sheet, and the total depends on how many sheets the tear-off shows need replacing. Everything else on the signed quote is locked, so you will not pay more for it later.

When you compare bids, check that each one includes the same items. A lower number that leaves out tear-off, flashing or ventilation is not the same roof.

Our Roof Replacement Process, Step by Step

  1. Free inspection. We look at the roof surface, edges, flashing and vents, and at the attic when we can get into it. On steep or tall roofs we use a drone to photograph the slopes up close. You get the photos and a plain summary of what we found.
  2. Written quote. Your price-locked quote usually arrives within 24 to 48 hours of the inspection. It names the material, the scope and the per-sheet decking price.
  3. Your decision. The proposal holds for about 15 days. Once you sign, the price is locked.
  4. Permit and windstorm paperwork. We pull the City of Corpus Christi permit, or the county permit outside city limits, and schedule the windstorm inspections with the Texas Department of Insurance. Materials are ordered and your start date is set.
  5. Tear-off. The crew strips the roof to bare deck and picks up debris as the work goes.
  6. Decking. We check every sheet and replace the soft or rotted ones at the per-sheet price on your quote.
  7. Installation. Drip edge, underlayment and flashing go on first, then the shingles or panels, then the ridge vent and caps. The windstorm inspections take place while the work can still be seen.
  8. Cleanup. Debris is hauled off, and the yard and driveway get a magnet sweep.
  9. Final walkthrough and certificate. We walk the finished roof with you and hand over the warranty paperwork. TDI issues the WPI-8 certificate once the work passes inspection, and we make sure you get a copy.

How Long a Roof Replacement Takes

Think of the timeline in two parts: the time before the crew arrives and the days they spend on your roof. The first part covers the inspection, the quote, your decision, the permit and the material order. Stock shingles usually arrive sooner than metal panels or special-order colors, so the material you pick affects the start date.

Time on the roof depends on size, pitch and material. A simple shingle roof on a one-story house goes much faster than a large, steep roof with many valleys and dormers. Metal and tile take longer than shingles, because each panel or tile has to be cut, fitted and flashed around every edge and opening. Rotten decking, a second layer of old roofing and weather days can each add time.

We do not quote a day count before we have seen the roof. Your proposal shows the expected schedule, and if rain or high wind moves a work day, we tell you the new date. Crews cannot lay underlayment on a wet deck or carry long metal panels safely in strong gusts, so a weather day protects your home as much as the crew.

If your roof is near the end of its life, plan around hurricane season, which runs from June 1 to November 30. Replacing it in the calmer months beforehand lets the work, the inspections and the certificate wrap up before the busiest part of the season.

Why We Tear Off the Old Roof

A full tear-off is our standard. A new layer laid over an old one hides the deck, so rotten wood stays in place, and the extra layer adds weight and can trap moisture. Stripping to bare deck is the only way to check the wood and fasten the new roof to something solid.

Nueces County is in the catastrophe area designated by the Texas Department of Insurance, and inside that area a tear-off is our rule without exception. A roof replaced here is built to the windstorm code and inspected during the work. Since April 1, 2026, that work is certified to the 2024 IRC, as TDI's adopted codes page notes, and our Texas windstorm insurance guide explains why the WPI-8 certificate matters for your coverage.

The one roof we will install over existing shingles is DECRA stone-coated steel, and only on homes outside the windstorm area, where DECRA's code report allows it. On a home inside the area, a DECRA roof starts with a full tear-off like any other.

Insurance Claims and Your New Roof

Homeowners and windstorm policies pay for sudden damage from events like hail and wind, not for a roof that has simply worn out. If a storm hit your roof, book a free inspection first. We photograph and measure the damage and give you a written report to send to your insurance company.

The adjuster sets the scope of the claim and decides what is covered. That conversation stays between you and your insurer: we do not attend the adjuster's inspection or argue over the estimate. Our part picks up again at tear-off. If removing the old roof turns up damage the approved scope missed, such as extra rotten decking, we send your insurer a supplement with photos so it can review the added work.

Your deductible is yours to pay. In Texas it is illegal for a contractor to waive it or cover it with a rebate, as the Texas Department of Insurance explains. Our article on whether insurance covers roof replacement goes into more detail.

Financing a Roof Replacement

Financing is available through Acorn Finance, a third-party lender, for qualified homeowners. RISE is not a lender: Acorn's lending partners review each application and make the credit decision. A loan spreads the cost of the roof over monthly payments; it does not change the price on your quote. Current terms are on our roof financing page.

Our 10-Year Workmanship Warranty

Every replacement comes with our 10-year workmanship warranty, which covers the installation itself. It belongs to the homeowner who hired us and does not transfer to a buyer if you sell the house. The material warranty is separate: it comes from the manufacturer, such as Owens Corning or DECRA, and that company sets its length and terms.

Roof Replacement Videos

Short videos of Owens Corning shingle roof replacements. They play muted; click a player to turn the sound on.

Building a new home, a shop or an addition instead? Our new roof installation page covers roofs for structures that do not have one yet. For a replacement, call us or send the form to book your free inspection.

Frequently Asked Questions

Our installed prices run $3.50 to $5.50 per square foot of roof for 3-tab shingles, $4.50 to $7.00 for architectural shingles, and $12 to $16 for standing seam metal or DECRA stone-coated steel. A 2,000 square foot roof in architectural shingles comes to $9,000 to $14,000. Rotten decking is priced per sheet, outside the signed price.

It depends on the size and pitch of the roof, the material and what the tear-off uncovers. A simple shingle roof takes much less time than a large metal or tile roof. Your proposal shows the expected schedule, and rain or high wind can move work days.

Not in Nueces County or anywhere else in the Texas windstorm area. There we tear off every roof so the deck can be checked and rotten boards replaced. The only roof we install over existing shingles is DECRA stone-coated steel on homes outside that area.

We document storm damage with photos and a written report you can send your insurer, and we send a supplement with photos if the tear-off uncovers damage the approved scope missed. The adjuster sets the scope and decides coverage, and the claim stays between you and your insurance company.

No. Our 10-year workmanship warranty stays with the homeowner who hired us. Manufacturer warranties on the materials have their own terms, including their own rules on transfers.

Industry resources from the National Roofing Contractors Association (NRCA).

Ready to Get Started?

Contact the Most Trusted Corpus Christi Roofing Contractor for a free, no-obligation estimate today.

Free Video or Voice Consultation
Skip the Hassle — Get Your Roof Quote in 24–48 Hours

No waiting around for multiple contractors to come bid your roof. One quick call is all it takes.

1
Book a time

Pick any slot that works for you — online and instant.

2
10-minute call

Free video or voice call. We answer your questions and gather what we need.

3
Quote in 24–48 hours

We email your price-locked quote — no pressure, no sales visit.

Book My Free Call →
FREE TOOL
Trace Your Roof. Get an Instant Price.

Use satellite imagery to outline your roof and receive a real installed price — no signup, no obligation.

Get Instant Roof Price → Takes less than 60 seconds

🔒 Free, no-obligation quote — Price-locked estimate in 24–48 hrs

📞 (361) 204-5325 Free Instant Quote
FREE Roof Calculator
FREE • NO SIGNUP
Get Your Instant
Roof Price

Trace your roof on satellite imagery and get a real installed price in under 60 seconds.

Open Roof Cost Calculator →

Powered by satellite roof measurement technology. No obligation.